Related Projects
Related Projects
LSG Tunnel at Frankfurt Airport
Germany
1 two-lane road tunnel and 1 bridge, total tunnel length 100 m, length of the total section to be built by us under the contract: approx. 520 m
Georgsberg Tunnel,
Germany
Foot and cycle path tunnel, length 114.77 m, max. clear width 6.45 m, clear height approx. 4.22 m.
Georgsberg Tunnel,
Germany
Foot and cycle path tunnel, length 114.77 m, max. clear width 6.45 m, clear height approx. 4.22 m.